skip to main
|
skip to sidebar
Tuesday, March 18, 2008
Process Work for CNNC Schematic Design
This was the first perspective that I drew. It was drawn before I had a concept and it was just an idea of how I might deal with organizing the space in the larger vault.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
IAR 202
IAR 202-01 Environmental Studio
Blog Archive
▼
2008
(19)
►
May
(5)
▼
March
(7)
Final CNNC Schematic Design
Final CNNC Schematic Design
Process Work for CNNC Schematic Design
Process Work for CNNC Schematic Design
Process Work for CNNC Schematic Design
Process Work for CNNC Schematic Design
Process Work for CNNC Schematic Design
►
February
(1)
►
January
(6)
►
2007
(19)
►
November
(7)
►
October
(5)
►
September
(7)
About Me
Emily Lasky
View my complete profile
No comments:
Post a Comment