skip to main
|
skip to sidebar
Tuesday, March 18, 2008
Process Work for CNNC Schematic Design
These are the drawing I did for the first charette we did in class. It really helped kick off some of the ideas that carried through to the end of the project. For example, the beams at the front entrance and the steps leading up to the front door.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
IAR 202
IAR 202-01 Environmental Studio
Blog Archive
▼
2008
(19)
►
May
(5)
▼
March
(7)
Final CNNC Schematic Design
Final CNNC Schematic Design
Process Work for CNNC Schematic Design
Process Work for CNNC Schematic Design
Process Work for CNNC Schematic Design
Process Work for CNNC Schematic Design
Process Work for CNNC Schematic Design
►
February
(1)
►
January
(6)
►
2007
(19)
►
November
(7)
►
October
(5)
►
September
(7)
About Me
Emily Lasky
View my complete profile
No comments:
Post a Comment